It is recommended to be used at the compressor outlet or before the dryer. It is used to discharge condensate/water droplets and particles formed as a result of pressure and temperature changes in the compressed air installation.
This ensures clean and dry compressed air, protecting downstream equipment from damage.
Regular use improves system efficiency and extends the life of pneumatic tools and machinery.
• Automatic condensate drain is integrated.
• By creating uninterrupted centrifugal force, waste is discharged with a very low pressure difference, thus providing maximum energy saving.
• Thanks to the Water Separator, problems such as corrosion, air leaks and valve jamming that may occur in pneumatic systems are prevented.
• High efficiency water separators cannot filter all the oil in compressed air, CFS or GFS series pre-filter, final-filter and carbon-filter should be used additionally for quality compressed air.
Model | Nom. Capacity (m³/min) | Capacity (cfm) | Connection | Max. Working Pressure (barg) | Body Material | Dimensions (W × H mm) | Weight (kg) |
---|---|---|---|---|---|---|---|
WSS 7 | 0.7 | 24.7 | ½” | 16 | Aluminum | 96 × 278 | 1.3 |
WSS 12 | 1.2 | 42.3 | ½” | 16 | Aluminum | 96 × 377 | 1.3 |
WSS 23 | 2.3 | 81.2 | ¾” | 16 | Aluminum | 124 × 354 | 2.5 |
WSS 37 | 3.7 | 130.6 | 1″ | 16 | Aluminum | 124 × 415 | 2.9 |
WSS 55 | 5.5 | 194.2 | 1″ | 16 | Aluminum | 124 × 501 | 3.3 |
WSS 65 | 6.5 | 229.2 | 1 ½” | 16 | Aluminum | 124 × 501 | 3.7 |
WSS 110 | 11.0 | 388.4 | 2″ | 16 | Aluminum | 160 × 674 | 7.9 |
WSS 220 | 22.0 | 776.9 | 2 ½” | 16 | Aluminum | 272 × 786 | 23 |
WSS 260 | 26.0 | 918.1 | 3” | 16 | Aluminum | 272 × 786 | 23 |
WSS 350 | 35.0 | 1,236.0 | 3” | 16 | Aluminum | 272 × 786 | 25 |
WSS 450 | 45.0 | 1,589.1 | 3” | 16 | Aluminum | 272 × 986 | 35 |
WSS 500 | 50.0 | 1,765.7 | DN150 | 16 | Aluminum | 730 × 1280 | 80 |
WSS 600 | 60.0 | 2,118.9 | DN150 | 16 | Aluminum | 750 × 1300 | 90 |
Piping Material Features Comparison |
|||
Piping Features | Stainless Steel(Type 304L) | Mild Steel | Blue anodized Aluminum Alloy |
Weight (Dia 6inch, Length 6m) | 127.2 | 169.6 | 29.142 |
Anti-Corrosive | Yes | No | Yes(100%) |
Pressure drop (Dia 2 inch Length= 20m, Airflow=3 cubic metres/Minute, Pressure=10 bar) | 0.25 | 0.4 Bar | 0.1 |
Efficient Energy Use | High | Low-moderate | High( Potential Cost savings of 34%) |
Structural Durability | Very Strong | Very Strong | Strong |
High Thermal Endurance | Yes | Yes | Yes |
Installation Ease | Less Difficult | Difficult | Easy(High Flexibility and Modularity) |
Simple Installation | Approx 6 feet length per hour | Approx 6 feet length per hour | Approx 45 feet Length per hour |
Manpower and Work Hours Needed for 2″ Pipe Over 3000 Feet | Approx 600 man-hours/8 men for 2 weeks | Approx 600 man-hours/8 men for 2 weeks | About 100 man-hours with 8 workers, completed in under 2 days |
Annual Charges for Installation, Commissioning & Operation | Approx 3000 dollars | Approx 7820 dollars | Approx 1300 dollars |
Installation Cost Breakdown: Material % / Labor % | 30% / 70% | 25% / 75% | 80% / 20% |
Texture of Surface | 0.03 | 0.05 | 0.001 |
Required Specialized Tools: Welder, Threader, Groove Cutter | Yes | Yes | No |
Quality of Air | High — When needed, these pipe systems comply with ISO 8573-1:2010 air quality standards | Low( Not according to !SO 8573-2010 air quality standards) | High — These pipe systems support compliance with ISO 8573-1:2010 air quality standards when required. |
Cost Rate per Meter | Almost 2 less than Aluminum | 3 Times less than Aluminum | 163.64 Dollars |
Service Life Depends on Environment, Pipe Design, and Grade | 30 years | 40 years | 20 years |
Upfront Installation Cost | Material : 30% Labor:70% | Material : 25% Labor:75% | Material : 80% Labor:20% |
Care and Maintenance | Difficult — Rust buildup under pipes and fittings can reach machinery, requiring weekly preventive maintenance. | Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) | Easy — No rust buildup, with preventive maintenance needed every 4 weeks. |