At CoolAir Compressors, we understand that every industry has unique requirements when it comes to compressed air systems. That’s why we offer complete, customized compressed air solutions designed to meet your specific operational needs. Whether you’re starting a new project or optimizing an existing system, we provide comprehensive services that ensure optimal performance and efficiency.
Our primary focus is on turnkey project management, handling every aspect of your compressed air system—from design and installation to ongoing service and monitoring. With our expertise, you can rest assured that your system is in good hands.
The first step in creating a reliable and efficient compressed air system is a well-thought-out design. At CoolAir Compressors, we collaborate closely with you to understand your facility’s needs, workflows, and production goals. We then create a customized compressed air system that ensures:
Once the design is finalized, our team takes care of the installation and commissioning of your system. We manage the entire process, from setting up the equipment to integrating it with your existing infrastructure. Our goal is to have your compressed air system up and running smoothly, on time, and within budget. Key services include:
A well-maintained system is key to long-term reliability and efficiency. At CoolAir Compressors, we offer comprehensive service and maintenance plans to ensure your system runs smoothly year after year. Our services include:
Effective monitoring is crucial to maintaining system efficiency and identifying potential issues before they become costly problems. Our compressed air monitoring solutions provide real-time data on system performance, energy usage, and maintenance needs. With constant oversight, you can:
Looking for a complete compressed air solution tailored to your industry? CoolAir Compressors is here to help you optimize your air system for performance, reliability, and cost savings.
Contact us today to learn more about our turnkey compressed air solutions and how we can help you improve your operations.
Contact CoolAir Compressors for planning, execution, monitoring & control, and maintenance of the compressed air system.
Piping Material Features Comparison |
|||
Piping Features | Stainless Steel(Type 304L) | Mild Steel | Blue anodized Aluminum Alloy |
Weight (Dia 6inch, Length 6m) | 127.2 | 169.6 | 29.142 |
Corrosion Resistant | Yes | No | Yes(100%) |
Pressure drop (Dia 2 inch Length= 20m,Airflow=3 cubic metres/Minute, Pressure=10 bar) | 0.25 | 0.4 Bar | 0.1 |
Energy Efficiency | High | Low-moderate | High( Potential Cost savings of 34%) |
Mechanical Strength | Very Strong | Very Strong | Strong |
High-Temperature Rating | Yes | Yes | Yes |
Installation Ease | Less Difficult | Difficult | Easy(High Flexibility and Modularity) |
Installation Time | Approx 6 feet length per hour | Approx 6 feet length per hour | Approx 45 feet Length per hour |
Work Hours/Manpower Required for a 2″ pipe and a 3000 feet piping | Approx 600 man-hours/8 men for 2 weeks | Approx 600 man-hours/8 men for 2 weeks | Approx 100 man-hours /8 men for less than 2 days |
Annual Cost(Installation, Commissioning, and operation) | Approx 3000 dollars | Approx 7820 dollars | Approx 1300 dollars |
Installation Cost Material%/Labor% | 30% / 70% | 25% / 75% | 80% / 20% |
Surface roughness | 0.03 | 0.05 | 0.001 |
Special Tools Required (welder, threader, groove cutter) | Yes | Yes | No |
Air Quality | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. | Low( Not according to !SO 8573-2010 air quality standards) | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. |
Cost per meter | Almost 2 less than Aluminum | 3 Times less than Aluminum | 163.64 Dollars(Parker Transair) |
Life Span( Will vary according to environmental factors, Pipe design, and Pipe grade. | 30 years | 40 years | 20 years |
Initial Cost of installations | Material : 30% Labor:70% | Material : 25% Labor:75% | Material : 80% Labor:20% |
Maintenance | Difficult(Accumulation of rust under pipes and fittings which travels to machinery, may require preventive maintenance every week) | Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) | Easy (No accumulation of rust, may require preventive maintenance every 4 Weeks) |