Compressed air is essential in flour mills, powering critical equipment and ensuring efficient operations. However, the design and installation of a compressed air system are often overlooked, leading to inefficiencies. Understanding its applications and components is vital for optimal performance.
In flour mills, compressed air serves several key functions:
These applications rely on the cyclic action of air cylinders to position gates and equipment effectively. Additionally, compressed air operates vibrators on machinery and atomizes liquids for even distribution when spraying products.
A well-designed compressed air system consists of three main components:
The Compressor: This is the heart of the system, responsible for compressing air. Rotary compressors are often preferred due to their efficiency and reliability.
The Distribution System: This network of pipes and fittings delivers compressed air throughout the plant, connecting to various machines and equipment.
Air-Using Equipment: This includes all machinery that relies on compressed air to function effectively, such as mixers, conveyors, and vibrators.
The selection and installation of the compressor and its associated equipment significantly impact the longevity and efficiency of the entire system. Atmospheric air is drawn through an intake filter, and the compressor raises its pressure to meet the plant’s requirements. Low and high-pressure switches control the compressor, ensuring optimal operation.
After compression, the air is often hot and must pass through an air dryer to remove moisture, which can be detrimental to piping systems and air-operated equipment. Maintaining dry air is crucial for the longevity of the system.
The air receiver acts as an accumulation tank, storing compressed air to meet peak demands. This ensures that there is always sufficient air available for operations, even during high-demand periods.
In summary, a well-designed compressed air system is vital for the efficient operation of flour mills. By understanding its applications and components, mill operators can enhance performance, reduce downtime, and improve product quality. Investing in a robust compressed air system ultimately leads to greater efficiency and productivity in flour milling operations.
Piping Material Features Comparison |
|||
Piping Features | Stainless Steel(Type 304L) | Mild Steel | Blue anodized Aluminum Alloy |
Weight (Dia 6inch, Length 6m) | 127.2 | 169.6 | 29.142 |
Corrosion Resistant | Yes | No | Yes(100%) |
Pressure drop (Dia 2 inch Length= 20m,Airflow=3 cubic metres/Minute, Pressure=10 bar) | 0.25 | 0.4 Bar | 0.1 |
Energy Efficiency | High | Low-moderate | High( Potential Cost savings of 34%) |
Mechanical Strength | Very Strong | Very Strong | Strong |
High-Temperature Rating | Yes | Yes | Yes |
Installation Ease | Less Difficult | Difficult | Easy(High Flexibility and Modularity) |
Installation Time | Approx 6 feet length per hour | Approx 6 feet length per hour | Approx 45 feet Length per hour |
Work Hours/Manpower Required for a 2″ pipe and a 3000 feet piping | Approx 600 man-hours/8 men for 2 weeks | Approx 600 man-hours/8 men for 2 weeks | Approx 100 man-hours /8 men for less than 2 days |
Annual Cost(Installation, Commissioning, and operation) | Approx 3000 dollars | Approx 7820 dollars | Approx 1300 dollars |
Installation Cost Material%/Labor% | 30% / 70% | 25% / 75% | 80% / 20% |
Surface roughness | 0.03 | 0.05 | 0.001 |
Special Tools Required (welder, threader, groove cutter) | Yes | Yes | No |
Air Quality | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. | Low( Not according to !SO 8573-2010 air quality standards) | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. |
Cost per meter | Almost 2 less than Aluminum | 3 Times less than Aluminum | 163.64 Dollars(Parker Transair) |
Life Span( Will vary according to environmental factors, Pipe design, and Pipe grade. | 30 years | 40 years | 20 years |
Initial Cost of installations | Material : 30% Labor:70% | Material : 25% Labor:75% | Material : 80% Labor:20% |
Maintenance | Difficult(Accumulation of rust under pipes and fittings which travels to machinery, may require preventive maintenance every week) | Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) | Easy (No accumulation of rust, may require preventive maintenance every 4 Weeks) |