In the aerospace industry, compressed air is a critical energy source for manufacturing, repairs, and overhauls. Its reliability and efficiency make it indispensable for powering various equipment and tools. However, contamination control is paramount, especially during the manufacturing of aerospace parts, where precision and cleanliness are crucial.
Using lubricated compressors that rely on oil can introduce contaminants into the compressed air, posing a serious risk to both the quality of the products and the safety of operations. To mitigate these risks, experts at Compressed Air Systems (CAS) recommend utilizing oil-free air compressors. These systems ensure that the air used in processes remains contaminant-free, promoting the integrity and performance of aerospace components.
In conclusion, compressed air is vital in the aerospace industry, playing a key role in manufacturing, testing, and maintenance. By prioritizing contamination control through the use of oil-free compressors, aerospace companies can enhance the quality and safety of their products. Investing in reliable compressed air systems is crucial for success in this highly regulated and precision-driven field.
Piping Material Features Comparison |
|||
Piping Features | Stainless Steel(Type 304L) | Mild Steel | Blue anodized Aluminum Alloy |
Weight (Dia 6inch, Length 6m) | 127.2 | 169.6 | 29.142 |
Anti-Corrosive | Yes | No | Yes(100%) |
Pressure drop (Dia 2 inch Length= 20m, Airflow=3 cubic metres/Minute, Pressure=10 bar) | 0.25 | 0.4 Bar | 0.1 |
Efficient Energy Use | High | Low-moderate | High( Potential Cost savings of 34%) |
Structural Durability | Very Strong | Very Strong | Strong |
High Thermal Endurance | Yes | Yes | Yes |
Installation Ease | Less Difficult | Difficult | Easy(High Flexibility and Modularity) |
Simple Installation | Approx 6 feet length per hour | Approx 6 feet length per hour | Approx 45 feet Length per hour |
Manpower and Work Hours Needed for 2″ Pipe Over 3000 Feet | Approx 600 man-hours/8 men for 2 weeks | Approx 600 man-hours/8 men for 2 weeks | About 100 man-hours with 8 workers, completed in under 2 days |
Annual Charges for Installation, Commissioning & Operation | Approx 3000 dollars | Approx 7820 dollars | Approx 1300 dollars |
Installation Cost Breakdown: Material % / Labor % | 30% / 70% | 25% / 75% | 80% / 20% |
Texture of Surface | 0.03 | 0.05 | 0.001 |
Required Specialized Tools: Welder, Threader, Groove Cutter | Yes | Yes | No |
Quality of Air | High — When needed, these pipe systems comply with ISO 8573-1:2010 air quality standards | Low( Not according to !SO 8573-2010 air quality standards) | High — These pipe systems support compliance with ISO 8573-1:2010 air quality standards when required. |
Cost Rate per Meter | Almost 2 less than Aluminum | 3 Times less than Aluminum | 163.64 Dollars |
Service Life Depends on Environment, Pipe Design, and Grade | 30 years | 40 years | 20 years |
Upfront Installation Cost | Material : 30% Labor:70% | Material : 25% Labor:75% | Material : 80% Labor:20% |
Care and Maintenance | Difficult — Rust buildup under pipes and fittings can reach machinery, requiring weekly preventive maintenance. | Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) | Easy — No rust buildup, with preventive maintenance needed every 4 weeks. |