At CoolAir Compressors, we understand that a well-designed compressor room is essential for ensuring efficient, reliable, and energy-saving operation of your compressed air systems. Our team specializes in providing customized solutions for compressor room design, ensuring that all equipment is optimally placed, systems are properly integrated, and energy usage is minimized. From equipment layout to advanced monitoring solutions, we offer a comprehensive approach to compressor room design.
We provide a full suite of design services to ensure that your compressor room meets the unique demands of your facility. Here’s how we approach the design process:
To ensure your compressor room operates at peak efficiency, we offer a complete solution for sourcing high-quality equipment. This includes:
At CoolAir Compressors, we focus on energy-saving solutions that maximize efficiency and reduce operating costs. Our team pays special attention to the following areas:
Whether you’re building a new compressor room or upgrading your existing setup, CoolAir Compressors is your trusted partner for efficient, energy-saving designs. Contact us today to learn more about our compressor room design services and how we can help optimize your compressed air systems.
Request a consultation or contact us to start designing your perfect compressor room today!
CoolAir Compressors provides complete Design, Installation & commissioning service of the Compressed Air system.
Piping Material Features Comparison |
|||
Piping Features | Stainless Steel(Type 304L) | Mild Steel | Blue anodized Aluminum Alloy |
Weight (Dia 6inch, Length 6m) | 127.2 | 169.6 | 29.142 |
Corrosion Resistant | Yes | No | Yes(100%) |
Pressure drop (Dia 2 inch Length= 20m,Airflow=3 cubic metres/Minute, Pressure=10 bar) | 0.25 | 0.4 Bar | 0.1 |
Energy Efficiency | High | Low-moderate | High( Potential Cost savings of 34%) |
Mechanical Strength | Very Strong | Very Strong | Strong |
High-Temperature Rating | Yes | Yes | Yes |
Installation Ease | Less Difficult | Difficult | Easy(High Flexibility and Modularity) |
Installation Time | Approx 6 feet length per hour | Approx 6 feet length per hour | Approx 45 feet Length per hour |
Work Hours/Manpower Required for a 2″ pipe and a 3000 feet piping | Approx 600 man-hours/8 men for 2 weeks | Approx 600 man-hours/8 men for 2 weeks | Approx 100 man-hours /8 men for less than 2 days |
Annual Cost(Installation, Commissioning, and operation) | Approx 3000 dollars | Approx 7820 dollars | Approx 1300 dollars |
Installation Cost Material%/Labor% | 30% / 70% | 25% / 75% | 80% / 20% |
Surface roughness | 0.03 | 0.05 | 0.001 |
Special Tools Required (welder, threader, groove cutter) | Yes | Yes | No |
Air Quality | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. | Low( Not according to !SO 8573-2010 air quality standards) | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. |
Cost per meter | Almost 2 less than Aluminum | 3 Times less than Aluminum | 163.64 Dollars(Parker Transair) |
Life Span( Will vary according to environmental factors, Pipe design, and Pipe grade. | 30 years | 40 years | 20 years |
Initial Cost of installations | Material : 30% Labor:70% | Material : 25% Labor:75% | Material : 80% Labor:20% |
Maintenance | Difficult(Accumulation of rust under pipes and fittings which travels to machinery, may require preventive maintenance every week) | Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) | Easy (No accumulation of rust, may require preventive maintenance every 4 Weeks) |