At CoolAir Compressors, we take the stress out of air compressor service, allowing you to focus on what matters most—your business. With our nationwide service network, we can quickly process your request and offer reliable support wherever you are.
We believe in taking service at face value. That’s why we offer a maintenance contract tailored specifically for your compressed air system. By choosing CoolAir Compressors for your service needs, you’ll benefit from:
If you have a service contract with us, our team will even remind you when it’s time for your next maintenance check!
Preventive maintenance is essential to ensure your compressed air system operates efficiently without unexpected failures. With scheduled maintenance and parts replacement as specified in your operating manual, you’ll enjoy:
Our goal is to help you avoid the consequences of equipment failure, extending the life of your system and reducing operational interruptions. With our preventive maintenance programs, you’ll significantly reduce the risk of system breakdowns.
Anytime, Day or Night—We’re Here When You Need Us!
If you experience an unexpected breakdown, our 24/7 Emergency Breakdown Service ensures quick response times and efficient repairs. With CoolAir Compressors on call, you’ll have peace of mind knowing expert help is always just a phone call away.
Prefer to maintain your equipment yourself? No problem! Our Maintenance Parts Subscription ensures you always have the right parts on hand when you need them. By subscribing, you’ll:
With our parts subscription, you’ll have everything you need for uninterrupted, efficient maintenance of your compressed air system.
Get in Touch with Us Today!
Don’t wait until a problem arises—be proactive and secure your air compressor’s performance with CoolAir Compressors. Contact us to learn more about our service contracts and how we can help keep your system running smoothly.
Piping Material Features Comparison |
|||
Piping Features | Stainless Steel(Type 304L) | Mild Steel | Blue anodized Aluminum Alloy |
Weight (Dia 6inch, Length 6m) | 127.2 | 169.6 | 29.142 |
Corrosion Resistant | Yes | No | Yes(100%) |
Pressure drop (Dia 2 inch Length= 20m,Airflow=3 cubic metres/Minute, Pressure=10 bar) | 0.25 | 0.4 Bar | 0.1 |
Energy Efficiency | High | Low-moderate | High( Potential Cost savings of 34%) |
Mechanical Strength | Very Strong | Very Strong | Strong |
High-Temperature Rating | Yes | Yes | Yes |
Installation Ease | Less Difficult | Difficult | Easy(High Flexibility and Modularity) |
Installation Time | Approx 6 feet length per hour | Approx 6 feet length per hour | Approx 45 feet Length per hour |
Work Hours/Manpower Required for a 2″ pipe and a 3000 feet piping | Approx 600 man-hours/8 men for 2 weeks | Approx 600 man-hours/8 men for 2 weeks | Approx 100 man-hours /8 men for less than 2 days |
Annual Cost(Installation, Commissioning, and operation) | Approx 3000 dollars | Approx 7820 dollars | Approx 1300 dollars |
Installation Cost Material%/Labor% | 30% / 70% | 25% / 75% | 80% / 20% |
Surface roughness | 0.03 | 0.05 | 0.001 |
Special Tools Required (welder, threader, groove cutter) | Yes | Yes | No |
Air Quality | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. | Low( Not according to !SO 8573-2010 air quality standards) | High(Should the application require it, these pipe systems can help meet the requirements of ISO 8573-1: 2010 air quality standards. |
Cost per meter | Almost 2 less than Aluminum | 3 Times less than Aluminum | 163.64 Dollars(Parker Transair) |
Life Span( Will vary according to environmental factors, Pipe design, and Pipe grade. | 30 years | 40 years | 20 years |
Initial Cost of installations | Material : 30% Labor:70% | Material : 25% Labor:75% | Material : 80% Labor:20% |
Maintenance | Difficult(Accumulation of rust under pipes and fittings which travels to machinery, may require preventive maintenance every week) | Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) | Easy (No accumulation of rust, may require preventive maintenance every 4 Weeks) |