High Efficiency & Compact Size
Three-stage W-type compression offers greater efficiency, lower piston force, and occupies less space.
Reliable Double-Acting Cylinders
Each stage has double-acting cylinders with multiple intake and exhaust valves to prevent failure and downtime.
Low Temperature & Energy Saving
Reduced operating temperatures save energy and increase the lifespan of components.
Strong & Easy-to-Maintain Build
Forged steel crankshaft and rust-proof stainless steel parts ensure durability and easy maintenance.
Advanced Valve Technology
PEEK valve plates reduce noise, improve sealing, and extend the life of internal parts.
Model | Power (KW) | Pressure (Mpa) | Air Flow (m³/min) | Size (mm) | Weight (KG) |
---|---|---|---|---|---|
AWH1030 | 11 | 3 | 1.0 | 1600×850×1250 | 450 |
AWH1230 | 15 | 3 | 1.2 | 1600×850×1240 | 460 |
AWH1630 | 18.5 | 3 | 1.6 | 1610×960×1230 | 510 |
AWH2030 | 22 | 3 | 2.0 | 1600×850×1250 | 650 |
2×AWH1230 | 2×15 | 3 | 2.4 | 1800×1750×1250 | 1000 |
2×AWH1630 | 2×18.5 | 3 | 3.2 | 1900×1900×1150 | 1100 |
2×AWH2030 | 2×22 | 3 | 4.0 | 2000×1000×2100 | 1500 |
3×AWH2030 | 3×22 | 3 | 6.0 | 3600×1000×1800 | 2300 |
AirHorse ensure every machine Runs well more than 15 years
Stock Available + Very Quickly Effect Shipment
24 Hours Service Always at your service
Piping Material Features Comparison |
|||
Piping Features | Stainless Steel(Type 304L) | Mild Steel | Blue anodized Aluminum Alloy |
Weight (Dia 6inch, Length 6m) | 127.2 | 169.6 | 29.142 |
Anti-Corrosive | Yes | No | Yes(100%) |
Pressure drop (Dia 2 inch Length= 20m, Airflow=3 cubic metres/Minute, Pressure=10 bar) | 0.25 | 0.4 Bar | 0.1 |
Efficient Energy Use | High | Low-moderate | High( Potential Cost savings of 34%) |
Structural Durability | Very Strong | Very Strong | Strong |
High Thermal Endurance | Yes | Yes | Yes |
Installation Ease | Less Difficult | Difficult | Easy(High Flexibility and Modularity) |
Simple Installation | Approx 6 feet length per hour | Approx 6 feet length per hour | Approx 45 feet Length per hour |
Manpower and Work Hours Needed for 2″ Pipe Over 3000 Feet | Approx 600 man-hours/8 men for 2 weeks | Approx 600 man-hours/8 men for 2 weeks | About 100 man-hours with 8 workers, completed in under 2 days |
Annual Charges for Installation, Commissioning & Operation | Approx 3000 dollars | Approx 7820 dollars | Approx 1300 dollars |
Installation Cost Breakdown: Material % / Labor % | 30% / 70% | 25% / 75% | 80% / 20% |
Texture of Surface | 0.03 | 0.05 | 0.001 |
Required Specialized Tools: Welder, Threader, Groove Cutter | Yes | Yes | No |
Quality of Air | High — When needed, these pipe systems comply with ISO 8573-1:2010 air quality standards | Low( Not according to !SO 8573-2010 air quality standards) | High — These pipe systems support compliance with ISO 8573-1:2010 air quality standards when required. |
Cost Rate per Meter | Almost 2 less than Aluminum | 3 Times less than Aluminum | 163.64 Dollars |
Service Life Depends on Environment, Pipe Design, and Grade | 30 years | 40 years | 20 years |
Upfront Installation Cost | Material : 30% Labor:70% | Material : 25% Labor:75% | Material : 80% Labor:20% |
Care and Maintenance | Difficult — Rust buildup under pipes and fittings can reach machinery, requiring weekly preventive maintenance. | Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) | Easy — No rust buildup, with preventive maintenance needed every 4 weeks. |