Skip to content

Textile

Cement

Food & Beverage

Plastic

Marine and Ship Building

paint industry

aerospace

special applications

Packaging

steel mills

Surgical

leather tannery

Mining

construction

transit

manufacturing

Pharmaceutical

Chemical

Sport

Feed Mills

automotive garage

flour mill

military

industrial manufacturing

Paper & Pulp

Tyre

Printing

farming agriculture

entertainment leisure

electronics

Snow

utility services

Glass

FootWare

Pipe

waste water treatment

heat transfer cooling

woodworking

general applications

Piping Material Features Comparison
Piping Features Stainless Steel(Type 304L) Mild Steel Blue anodized Aluminum Alloy
Weight (Dia 6inch, Length 6m) 127.2 169.6 29.142
Anti-Corrosive Yes No Yes(100%)
Pressure drop (Dia 2 inch Length= 20m, Airflow=3 cubic metres/Minute, Pressure=10 bar) 0.25 0.4 Bar 0.1
Efficient Energy Use High Low-moderate High( Potential Cost savings of 34%)
Structural Durability Very Strong Very Strong Strong
High Thermal Endurance Yes Yes Yes
Installation Ease Less Difficult Difficult Easy(High Flexibility and Modularity)
Simple Installation Approx 6 feet length per hour Approx 6 feet length per hour Approx 45 feet Length per hour
Manpower and Work Hours Needed for 2″ Pipe Over 3000 Feet Approx 600 man-hours/8 men for 2 weeks Approx 600 man-hours/8 men for 2 weeks About 100 man-hours with 8 workers, completed in under 2 days
Annual Charges for Installation, Commissioning & Operation Approx 3000 dollars Approx 7820 dollars Approx 1300 dollars
Installation Cost Breakdown: Material % / Labor % 30% / 70% 25% / 75% 80% / 20%
Texture of Surface 0.03 0.05 0.001
Required Specialized Tools: Welder, Threader, Groove Cutter Yes Yes No
Quality of Air High — When needed, these pipe systems comply with ISO 8573-1:2010 air quality standards Low( Not according to !SO 8573-2010 air quality standards) High — These pipe systems support compliance with ISO 8573-1:2010 air quality standards when required.
Cost Rate per Meter Almost 2 less  than Aluminum 3 Times less than Aluminum 163.64 Dollars
Service Life Depends on Environment, Pipe Design, and Grade 30 years 40 years 20 years
Upfront Installation Cost Material : 30% Labor:70% Material : 25% Labor:75% Material : 80% Labor:20%
Care and Maintenance Difficult — Rust buildup under pipes and fittings can reach machinery, requiring weekly preventive maintenance. Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) Easy — No rust buildup, with preventive maintenance needed every 4 weeks.