Piping Features Stainless Steel(Type 304L) Mild Steel Blue anodized Aluminum Alloy
Weight (Dia 6inch, Length 6m) 127.2 169.6 29.142
Anti-Corrosive Yes No Yes(100%)
Pressure drop (Dia 2 inch Length= 20m, Airflow=3 cubic metres/Minute, Pressure=10 bar) 0.25 0.4 Bar 0.1
Efficient Energy Use High Low-moderate High( Potential Cost savings of 34%)
Structural Durability Very Strong Very Strong Strong
High Thermal Endurance Yes Yes Yes
Installation Ease Less Difficult Difficult Easy(High Flexibility and Modularity)
Simple Installation Approx 6 feet length per hour Approx 6 feet length per hour Approx 45 feet Length per hour
Manpower and Work Hours Needed for 2″ Pipe Over 3000 Feet Approx 600 man-hours/8 men for 2 weeks Approx 600 man-hours/8 men for 2 weeks About 100 man-hours with 8 workers, completed in under 2 days
Annual Charges for Installation, Commissioning & Operation Approx 3000 dollars Approx 7820 dollars Approx 1300 dollars
Installation Cost Breakdown: Material % / Labor % 30% / 70% 25% / 75% 80% / 20%
Texture of Surface 0.03 0.05 0.001
Required Specialized Tools: Welder, Threader, Groove Cutter Yes Yes No
Quality of Air High — When needed, these pipe systems comply with ISO 8573-1:2010 air quality standards Low( Not according to !SO 8573-2010 air quality standards) High — These pipe systems support compliance with ISO 8573-1:2010 air quality standards when required.
Cost Rate per Meter Almost 2 less  than Aluminum 3 Times less than Aluminum 163.64 Dollars
Service Life Depends on Environment, Pipe Design, and Grade 30 years 40 years 20 years
Upfront Installation Cost Material : 30% Labor:70% Material : 25% Labor:75% Material : 80% Labor:20%
Care and Maintenance Difficult — Rust buildup under pipes and fittings can reach machinery, requiring weekly preventive maintenance. Difficult (Accumulation of rust under pipes and fittings which travels to machinery may require preventive maintenance every 3-4 days) Easy — No rust buildup, with preventive maintenance needed every 4 weeks.